BBC Media

This scheme was a new build high rise apartment block in Salford Quays. Extensive works requiring 120 minutes fire protection over 25 floors. Profire systems ltd were the appointed contractor of choice to install high quality firestopping systems to the residential A and Residential B buildings during the original construction for Bovis Lend Lease/ BBC …

Durham University

Client – Durham University. Problem was that extensive compartment integrity surveys were commissioned by the Durham University Estates Department. Unfortunately it was realised that full, comprehensive fire compartment drawings were not readily available. Solution – Profire Systems Ltd commissioned the development of an App which electronically records the survey and fire stopping installation process. This …

Interserve/NHS Carlisle Hospital

Client – Interserve/NHS Carlisle Hospital The Aseptic suite at Carlisle Hospital is a sterile, controlled environment for preparing specific injectable medicines including chemotherapy, and clinical trials. These medicines are to be distributed throughout the North of England. However as a result the Aseptic Suite could not be closed as the disruption and loss of production …